Create a first-phase Paperclip operating model for HASMaster that matches the real state of the project: the website and content platform are nearly production-ready, the scenario workflow model already exists, the agent roster is already defined, and video and YouTube operations still need tool and process buildout.
Company
Create one company: HASMaster.
Suggested company goal:
Guide people through the full automation lifecycle with privacy-first design, operation, and maintenance; turn real automation solutions into structured content; and grow HASMaster through the platform, the scenario pipeline, and the HASMaster_1000 media engine.
Projects
- Strategy and Business: monetization, KPI definition, vendor strategy, launch sequencing, and business model decisions.
- Platform and Site: WordPress staging readiness, theme and plugin release readiness, journeys, assistant UX, and documentation and publishing operations.
- Scenario Pipeline: one parent issue per scenario, child issues for WF-200-01 through WF-200-03, and Paperclip visibility fed by LangGraph and n8n when needed.
- Production Tools: video and YouTube operating system buildout, Google tooling, asset handling, publishing, and media storage.
Agents
- Executive Showrunner
- COO
- Project Manager
- Writer
- Editor
- QA Engineer
- Documentation Librarian
Use the Librarian as a first-phase agent, not a later cleanup role.
What Not To Create As Permanent Agents Yet
Do not create long-lived Paperclip agents for workflow functions such as device-research, documentation, evaluation-scorer, wordpress-publisher, or journey stages like get-inspired, setup, or automate. Model those as issues, child issues, or workflow runs instead.
Librarian Operating Rule
- Check runtime truth in
/mnt/hasmaster_1000and/mnt/nas_docker_apps. - Update canonical local docs under
/mnt/nas_docs. - Update staged published guides when the change affects operator-facing or public-facing guidance.
- Keep local docs and staged published material in sync.
Approval Rule
Apply the Home Lab approval policy to this bootstrap.
- Creating or updating the first-phase Paperclip structure is pre-approved when you ask for it.
- Documentation updates and staging guide alignment are pre-approved parts of the same workflow.
- Release, publish, production cutover, and destructive rollback remain explicit actions.
- Operational credentials belong in 1Password, not in docs or temporary session state.
Skills And MCPs To Use First
Prioritize Documentation Librarian with the documentation-librarian, manual-librarian, hasmaster-prod-retrieval, and hasmaster-publish skills plus the docs, doc-mcp, cms-wordpress-staging, and data-weaviate MCPs. Use Project Manager with portainer, sys-api, and playwright. Use QA Engineer with ha-mcp, playwright, portainer, and sys-api. Use Writer and Editor with docs, cms-wordpress-staging, and playwright. Use COO and Executive Showrunner with docs and data-weaviate.
First Week Plan
- Create company
HASMaster. - Create the four projects in this guide.
- Create the seven durable agents in this guide.
- Add the initial issues listed under each project.
- Create one real scenario parent issue plus the three workflow child issues in
Scenario Pipeline. - Use Documentation Librarian to update local docs and staged guides as you refine the operating model.
- Only after the board feels natural, wire more automation into the Paperclip bridge.
Current Live Seed Status
As of 2026-04-02, this model has been applied to the live HASMaster Paperclip company.
- The four first-phase projects exist.
- The seven durable agents exist.
- The starter issue set exists across strategy, platform, scenario, and production tools.
- The first
SCN-001parent issue and theWF-200-01toWF-200-03child issues exist. - The original onboarding project was archived and its starter issue was cancelled.
- The Librarian alignment issue was added so docs and published guides remain part of the operating model.
Next Step
After the first-phase model is live, move to the HASMaster scenario pipeline guide and wire the LangGraph and n8n status bridge so Paperclip reflects real workflow state.